ARCELORMITTAL GHENT – BLAST FURNACE B

posted on 16.01.2021 Vadamon / Vadalub copyright images: ArcelorMittal Ghent

Detailed engineering of all hydraulic and lubrication piping on the tower of Blast Furnace B at the Flat Products Steel Plant in Ghent, optimised for minimum erection time.
Piping was engineered in 3D, bent and welded and delivered in finished modules, complete with supporting structures.
Each floor level of the furnace was equipped and detailed with piping before assembly of the Blast Furnace tower.
On the construction site, only take over points between the floor levels had to be connected.

 

BOUDEWIJN AND VAN CAUWELAERT LOCKS

posted on 20.08.2019 Vadalub

Engineering and TCF management of the lubrication system for 5 bridges in the Port of Antwerp.

VANDAMMESLUIS

posted on 17.12.2018 Vadalub

Engineering consultancy for the central greasing system for Door 4 of the Pierre Vandammesluis lock in the Port of Zeebrugge.

DR-Z 650 BIG E / R / S

posted on 21.03.2018 Suzuki ( we kind of wish, so no, this one's just for fun )

Concept sketch for a family of SV650 V-twin powered motorcycles, worthy successors of the original DR BIG.

Hooligan attitude in a tough adventure package with capable suspension, a reliable engine and real-world, all-road performance.

Would fit nicely in the off-road adventure niche, at the opposite end of the CRF1000L Africa Twin and just below the Tenere 700 World Raid and KTM 790 Adventure.

HIGH STRENGTH STEEL @ ARCELORMITTAL GHENT

posted on 05.01.2018 ArcelorMittal Ghent

Ambiani helps readying the hydraulic systems at AM Ghent plant for the production of Fortiform high strength steel.

DAMTECH CRYOFREEZER DOING GREAT!

posted on 31.08.2017 DamTech

Finishing touches and final tuning before production.

Engineering and project file management by Ambiani.

GARDEN GATE

posted on 08.07.2017 Herman-Sanders

Remotely operated automatic garden gate in stainless steel and tropical hardwood.

Design and execution by Ambiani.

S-IN MOTION – ARCELORMITTAL

posted on 22.06.2017 Arcelor Mittal Gent

A new S-in motion® study from ArcelorMittal has identified potential weight savings of up to 25 percent on the body-in-white of European D-segment vehicles by compared with recent models.

Click for link.

NEW MILL STANDS FOR HIGH STRENGTH STEEL AT ARCELORMITTAL GENT.

posted on 04.04.2017 ArcelorMittal via Randstad

Helping to solve the final points is a fine introduction to a world of hundreds of tons of steel.

Click for video.

SAFETY BARRIER LIMMEL

posted on 20.03.2017 Bosch Rexroth

Some pictures of the main features of the new safety barrier from the website of Project Developpers BESIX.

SAFETY BARRIER LIMMEL

posted on 14.03.2017 Bosch Rexroth for Agidens / BESIX

Hoist and installation of 54m barrier door @ Limmel, Maastricht.

Site coordination support for hydraulics by Ambiani.

HOT STRIP ROLLING MILL AMG

posted on 10.02.2017 ArcelorMittal Ghent

Technical Consultant Hydraulics via Randstad @ Engineering & Investments Department ArcelorMittalGent – hot rolling mill for new generation high strength steel

INSTALLATION OF A11 BRIDGE DECKS

posted on 20.12.2016 Bosch Rexroth for ViaBrugge

Stunning movie of the installation of the A11 highway bridges @ Bruges.

BOTH A11 BRIDGES IN ALL THEIR SPLENDOR.

posted on 02.12.2016 Bosch Rexroth

Pictures from magenta.be.

A11 – 72 METER BRIDGE DECKS POINT AT THE SKY

posted on 29.11.2016 Bosch Rexroth

All hydraulic systems on the A11 @ Bruges, Belgium are on line, both bridges pointing towards the sky as we speak.

Click for video.

FREEZING IN ANTWERP

posted on 29.11.2016 Bosch Rexroth for Port of Antwerp

Last phase of the hydraulic piping @ Mexicobruggen, Antwerp.

Project management hydraulics by Ambiani.

MEXICO BRIDGES

posted on 21.11.2016 Bosch Rexroth for Port of Antwerp

Measuring the hydraulic piping under the refurbished Mexico bridges Antwerp, Belgium on a nice warm morning in November..

MEXICO BRIDGES

posted on 19.11.2016 Aertssen

Installation of the Eastern bridge deck in the Port of Antwerp.

BASCULATING BRIDGES A11

posted on 16.11.2016 Bosch Rexroth for Fabricom / ViaBrugge

Hoist of the northern bridge on the A11, Dudzele.

A11 HIGHWAY BRIDGES

posted on 16.09.2016 Bosch Rexroth

Installation of the hydraulic cylinders for the double basculating bridges on the A11, near Bruges.

Project management support for hydraulics by Ambiani.

MOUNTAIN CYCLE SHOCKWAVE

posted on 01.12.2015 Mountain Cycle

Update of the legendary Mountain Cycle Shockwave to the latest standards, preserving the original’s unique design language.
Every part was specifically designed for the best possible synergy between components. The concept features a race-ready geometry and proven shock ratio with fully detailed wall thicknesses and bearings.
All components were designed in house, specifically for this bike.

WORK IN PROGRESS…

posted on 20.11.2015 non disclosed client

OUR OWN SOLIDWORKS LICENSE – LET’S GO DESIGN!

posted on 01.09.2015 SolidWorks

CONCEPT SKETCH FOR MTB SUSPENSION COMPONENTS.

posted on 24.08.2015 Marzocchi Suspension

Since they seem to be ending their activities…
Last hurrah for Marzocchi Suspension, with a Shiver SC and Roco Ti concept.

SITE MEASUREMENT

posted on 06.08.2015 Europizza

Quick site measurement assignment in Amsterdam and today’s second working day is over.

SPARK EROSION OF POROUS STAINLESS STEEL FILTER STAMPS.

posted on 31.07.2015 De Craecker Matrijzen

HOT ROD

posted on 08.04.2015

Just for fun… Render of an old hot rod concept sketch.

CRYOCAB

posted on 18.11.2014 MEC crios

Technical specifications and mechanical design for a cryogenic cabinet suitable for use with liquid nitrogen and CO2 snow at temperatures below -70°C.