ARCELORMITTAL GHENT – BLAST FURNACE B
16.01.2021 Vadamon / Vadalub copyright images: ArcelorMittal Ghent
Detailed engineering of all hydraulic and lubrication piping on the tower of Blast Furnace B at the Flat Products Steel Plant in Ghent, optimised for minimum erection time.
Piping was engineered in 3D, bent and welded and delivered in finished modules, complete with supporting structures.
Each floor level of the furnace was equipped and detailed with piping before assembly of the Blast Furnace tower.
On the construction site, only take over points between the floor levels had to be connected.